Project Attributes Abu Dhabi

Project, Package 2A

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation

Consultant: Halcrow International

Scope of Work: Electrical works for the Bridges BC-3, BC-4, BC-5, BC-6, BC-7 & BC-8 Supply and installation of Cables, Support systems, Light Poles, Navigational Lights, Day markers and Control Panels.

Automated Waste Collection System

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: ENVAC Middle East (Consultant – Halcrow International)

Scope of Work: Trench Excavation works, fabrication and installation of 5.89 kilometers of MS pipeline, Installation of 17.55 Kms HDPE Pipes and Installation of 13.3. Kms Cathodic Protection System.

Southern Tunnel Crossing – Yas Island Development Project

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation (Consultant – Halcrow)

Scope of Work: Tunnel Drainage System with three Pumping Stations (16 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 40 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.

Plant Wide – Underground Services at EMAL

Posted by | | No Comments

Location: Taweelah, Abu Dhabi

Client: Emirates Aluminium

Contractor: Consolidated Contracting Engineering

Consultant: SNC LAVALIN International

Scope of Work: Pipe laying and testing & commissioning of Storm water, Sanitary Sewage, Fire Water Pressurized, Potable Water, Permeate Service Water, Pressurized Sanitary Sewage, Pumped Storm Water and Compressed Air and Natural Gas Services.

Cast House Mechanical Installation Pkg CM-7264

Posted by | | No Comments

Location: Taweelah, Abu Dhabi

Client: EMAL

Contractor: Larsen and Toubro (Consultant – SNC LAVALIN)

Scope of Work: Supply of Pipes, Fittings and Accessories, Painting, Welding, Installation and hydro testing of the piping as per project specification.

Accommodation Relocation and Utility Project

Posted by | | No Comments

Location: Upper Zakum North Island

Client: ZADCO

Contractor: NMDC Abu Dhabi

Scope of Work: Mechanical & Electrical infrastructure works include Supply, Installation, Hydro testing of Pipes including fittings and accessories for Drainage and Potable Water Network and relocation of MDB, SDBs & SSDBs, including power & earth cabling works.

Saadiyat Island Tunnel – Museum Infrastructure

Posted by | | No Comments

Location: Saadiyat Island, Abu Dhabi

Client: TDIC

Contractor: NUROL (Consultant : CHSS)

Scope of Work: Tunnel Drainage System with Two Pumping Stations (5 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 20 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.

Seaed Geosolutions For Hail Island

Posted by | | No Comments

Location: Hail Island

Client: ADNOC

Contractor: NMDC, Abu Dhabi

Scope of Work: Mechanical & Electrical infrastructure works include Supply, Installation, Hydro testing of Pipes, fittings and accessories for Drainage and Potable Water Network and supply, installation and testing of MDB & SSDBs for the complete facility.

MAFRAQ Hospital Pkg II Feeder Line for Irrigation System

Posted by | | No Comments

Location: Mafraq, Abu Dhabi

Client: SEHA

Contractor: Al Habtoor Leighton Murray and Roberts

Scope of Work: Mechanical Work include supply installation of DI Pipes, Valves and GRP Pipe works and Electrical Works include control panel, flow meters and associated cable interconnections.