Projects

Delma Port Marine Works North

Location: Delma Island
Client: Abu Dhabi Ports
Contractor: NMDC

Electrical and Street Lighting works: Supply and Installation of Light Pole (14 Mtr height) with Single Arm Led Luminaire with required foundation and accessories. Electrical works including LV cables from Substation to Feeder Pillar, Cables from Feeder Pillar to SLCC, Cable from SLCC to street lighting pole, Street lighting control cabinet including solar timer, Earth pit and Feeder Pillar.

Delma Port Marine Works North


 

Foam Pump Replacement At Al Ain Zakher Terminal – 6000030264

Location: Al Ain
Client: ADNOC Distribution
Contractor: Venus Infrastructure Contracting LLC

Replacement of Foam Pumps Diesel engine driven pumps, electrical motor driven pumps and jockey Pumps with new foam pump. Piping Modification works and installation of PRV, PSV and Pressure Transducer. I & C, Pump Controller Modification works for the New Pumps with Operation of stations.

Foam Pump Replacement At Al Ain Zakher Terminal - 6000030264


 

Replacement Of Piping At Old Image Stations in UAE – P4700014757

Location: Northern Emirates & Abudhabi Region
Client: ADNOC Distribution
Contractor: Venus Infrastructure Contracting LLC

Replacement of existing underground carbon steel fuel piping system with new polyethylene pipe (both delivery and offloading lines) and replace existing vent lines with new cast iron pipe including all Civil and Mechanical works.

Replacement Of Piping At Old Image Stations in UAE - P4700014757


 

Riyadh City South Phase 4 – Infrastructure and Streetscape

Location: Abu Dhabi

Client: Aldar Properties

Contractor: Nurol LLC

Potable Water Network and Irrigation Network

Mechanical Work include supply & installation of Ductile Iron Pipes & Fittings(PN16), Ductile Iron Valves & Fittings(PN16). Supply, Installation & Testing of Breakable Type Fire Hydrants. Supply & Installation of Electromagnetic Flowmeters. Installation Works for Sector Measuring Points including GRP Sector metering Kiosk and associated cabling works and earthing.

Riyadh City South Phase 4 – Infrastructure and Streetscape


 

Saadiyat Island Infrastructure Projects P031 Marina District Deep Utilities

Location: Saadiyat Island

Client: TDIC

Contractor: Nurol LLC

Scope of Work include Supply, installation and testing of HDPE SDR 17 PN10 630mm, 450mm, 160mm Dia pipe and fittings. Supply, Installation and testing of GRP Pipes and fittings (for depth below 5 mtr Stiffness is 5000 N/M2 and for depth above 5 Mtr Stiffness is 10000 N/M2)

Saadiyat Island Infrastructure Projects P031 Marina District Deep Utilities


 

Supply, Installation and Commissioning of New Electromagnetic Flow Meters in Abu Dhabi Region

Location: New Flow meters in Abu Dhabi

Client: TRANSCO

Contractor: Venus Infrastructure

Scope of Work include Supply and Installation of Electromagnetic Flow Meters Taweela.A1, and Taweela A2.

Supply, Installation and Commissioning of New Electromagnetic Flow Meters in Abu Dhabi Region


 

Maintenance, Improvement and Upgrade of Hamad Bin Abdullah Road Al Fujairah

Location: Fujairah

Client: Ministry of Infrastructure Development

Contractor: BATCO

Scope of Work include Supply and Installation of HDPE, E Upvc, GRP pipes and fittings, testing of submersible pumps, Valves, Testing of MCC panels, testing of MDB for substation, testing of capacitor bank and testing of oil type transformer

Maintenance, Improvement and Upgrade of Hamad Bin Abdullah Road Al Fujairah


 

Relocation of Existing Potable Water and Electrical Network at Jubail Island

Location: Jubail Island

Client: Jubail Island Investment Company

Contractor: NMDC

Scope of Work include Supply and Installation of ADDC HDPE pipes and fittings, DI fittings in valve chambers, Isolation gate valves, Air release valve, uPVC Cable Ducts in trenches, and 530 meters of HDD works

Relocation of Existing Potable Water and Electrical Network at Jubail Island


 

N – 14673.2 MIRFA C

Location: Madinat Zayed

Client: TRANSCO

Contractor: METITO

Scope of Work: Fabrication and Installation of CI Pipes works and Pumping Station Installation works includes Mechanical works, Installation of Surge Vessel and Main Pumps.

N – 14673.2 MIRFA C


 

Al Ain Stadium and Tunnel

Location: Al Ain

Client: Musanada/AADC

Contractor: BATCO

Scope of Work: Installation of Pumping Station and external works includes Mechanical works and Electrical works with external Piping consist of Pumps, MCC, ATS, Generators, Flow meters, Valves, DI Pipes works & GRP Pipes works

Al Ain Stadium and Tunnel


 

Camp Office and Accommodation Facility Project

Location: Upper Zakum West Island

Client: ZADCO

Contractor: Spacemaker, Dubai

Scope of Work: Mechanical and electrical infrastructure works including supply, installation, hydro testing of pipes, fitting and accessories for drainage and portable water network. Supply and installation of MDB, SMDBs, including power and earth cabling works.

Camp Office and Accomodation Facility Project 2


 

MAFRAQ Hospital Pkg II Feeder Line for Irrigation System

Location: Mafraq, Abu Dhabi

Client: SEHA

Contractor: Al Habtoor Leighton Murray and Roberts

Scope of Work: Mechanical Work include supply installation of DI Pipes, Valves and GRP Pipe works and Electrical Works include control panel, flow meters and associated cable interconnections.

MAFRAQ Hospital Pkg II Feeder Line for Irrigation System


 

Camp Office and Accommodation Facility Project

Location: Upper Zakum North Island

Client: ZADCO

Contractor: Leighton Contracting Abu Dhabi

Scope of Work: Mechanical and Electrical infrastructure works including supply, installation, hydro testing of pipes, fittings and accessories for drainage and potable water network. Supply and installation of MDB, SMDBs including power and earth cabling works.

Camp Office and Accomodation Facility Project 3


 

Seaed Geosolutions For Hail Island

Location: Hail Island

Client: ADNOC

Contractor: NMDC, Abu Dhabi

Scope of Work: Mechanical & Electrical infrastructure works include Supply, Installation, Hydro testing of Pipes, fittings and accessories for Drainage and Potable Water Network and supply, installation and testing of MDB & SSDBs for the complete facility.

Seaed Geosolutions For Hail Island


 

Saadiyat Island Tunnel – Museum Infrastructure

Location: Saadiyat Island, Abu Dhabi

Client: TDIC

Contractor: NUROL (Consultant : CHSS)

Scope of Work: Tunnel Drainage System with Two Pumping Stations (5 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 20 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.

Saadiyat Island Tunnel - Museum Infrastructure


 

Accommodation Relocation and Utility Project

Location: Upper Zakum North Island

Client: ZADCO

Contractor: NMDC Abu Dhabi

Scope of Work: Mechanical & Electrical infrastructure works include Supply, Installation, Hydro testing of Pipes including fittings and accessories for Drainage and Potable Water Network and relocation of MDB, SDBs & SSDBs, including power & earth cabling works.


 

Cast House Mechanical Installation Pkg CM-7264

Location: Taweelah, Abu Dhabi

Client: EMAL

Contractor: Larsen and Toubro (Consultant – SNC LAVALIN)

Scope of Work: Supply of Pipes, Fittings and Accessories, Painting, Welding, Installation and hydro testing of the piping as per project specification.

Cast House Mechanical Installation Pkg CM-7264


 

Camp Office and Accommodation Facility

Location: Upper Zakum South Island

Client: ZADCO

Contractor: Spacemaker

Scope of Work: Mechanical & Electrical infrastructure works include Supply, Installation, Hydro testing of Pipes including fittings and accessories for Drainage and Potable Water Network and relocation of MDB, SDBs & SSDBs, including power & earth cabling works.

Camp Office and Accomodation Facility Project 1


 

MAFRAQ Hospital Package II – Relocation of Irrigation Pumps

Location: Mafraq, Abu Dhabi

Client: SEHA

Contractor: Al Habtoor Leighton Murray & Roberts

Scope of Work: Mechanical & Electrical Works Relocation of existing pumps and control panel to the new reservoir, new pipe line and tie-in.

MAFRAQ Hospital Pkg II Feeder Line for Irrigation System


 

DG Equipments at Arzanah Island

Location: Arzanah Island

Client: ZADCO

Contractor: ADMMI

Scope of Work: Include Mechanical and Electrical works Supply and Installation of Fuel Pipeline, GRP cable trays, earthing system, 13.8KV cable laying works and Testing of MV cables.

DG Equipments at Arzanah Island


 

Plant Wide – Underground Services at EMAL

Location: Taweelah, Abu Dhabi

Client: Emirates Aluminium

Contractor: Consolidated Contracting Engineering

Consultant: SNC LAVALIN International

Scope of Work: Pipe laying and testing & commissioning of Storm water, Sanitary Sewage, Fire Water Pressurized, Potable Water, Permeate Service Water, Pressurized Sanitary Sewage, Pumped Storm Water and Compressed Air and Natural Gas Services.

Plant Wide – Underground Services at EMAL


 

Al Ain Water Distribution Network

Location: Al Ain

Client: TRANSCO

Contractor: Torishima Pump Mfg. Co. (Consultant – ILF)

Scope of Work: Include Fabrication, Installation and testing of FBE coated CS Pipes & Fittings size 400mm dia to 2200mm dia (free issued by client), Field Welding of Pipe Joints & Non Destructive Testing (NDT) of welded joints and Holiday Check for the CS Pipes.

Al Ain Water Distribution Network


 

Southern Tunnel Crossing – Yas Island Development Project

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation (Consultant – Halcrow)

Scope of Work: Tunnel Drainage System with three Pumping Stations (16 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 40 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.

Yas Marina Circuit Construction, Abu Dhabi, United Arab Emirates, 18-19 November 2008.


 

Automation Water Supply System

Location: Al Ain

Client: TRANSCO

Contractor: ASTRACO Construction (Consultant – Tebodin)

Scope of Work: Supply, installation and testing and commissioning of Control Valves, RTU shelter with DB, SMDB, UPSDB & A/C Sequence panel for remote SCADA operation.

Automation Water Supply System


 

Automated Waste Collection System

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: ENVAC Middle East (Consultant – Halcrow International)

Scope of Work: Trench Excavation works, fabrication and installation of 5.89 kilometers of MS pipeline, Installation of 17.55 Kms HDPE Pipes and Installation of 13.3. Kms Cathodic Protection System.

Automated Waste Collection System


 

See Water Outfall

Location: Palm Jumeirah Gateway, Dubai

Client: Dubai Municipality

Contractor: Taisei Corporation Dubai (Consultant – Parsons)

Scope of Work: Mechanical and Electrical works Supply and Installation of Penstock, Duckbill Check Valve, GRP Pipes & Fittings (up to 1800 dia) and Associated Civil Works.


 

Storm Water Drainage Line

Location: Palm Jumeirah Gateway, Dubai

Client: Nakheel

Contractor: Taisei Corporation

Consultant: Parsons

Scope of Work: Earthwork excavation for laying pipe, Construction of circular manholes and supply and Installation of GRP Pipes from 400mm, 1400mm, 1600 & 1800 dia.

Storm Water Drainage Line


 

Project, Package 2A

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation

Consultant: Halcrow International

Scope of Work: Electrical works for the Bridges BC-3, BC-4, BC-5, BC-6, BC-7 & BC-8 Supply and installation of Cables, Support systems, Light Poles, Navigational Lights, Day markers and Control Panels.

Project, Package 2A