Project Attributes Yas Island

Project, Package 2A

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation

Consultant: Halcrow International

Scope of Work: Electrical works for the Bridges BC-3, BC-4, BC-5, BC-6, BC-7 & BC-8 Supply and installation of Cables, Support systems, Light Poles, Navigational Lights, Day markers and Control Panels.

Automated Waste Collection System

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: ENVAC Middle East (Consultant – Halcrow International)

Scope of Work: Trench Excavation works, fabrication and installation of 5.89 kilometers of MS pipeline, Installation of 17.55 Kms HDPE Pipes and Installation of 13.3. Kms Cathodic Protection System.

Southern Tunnel Crossing – Yas Island Development Project

Posted by | | No Comments

Location: Yas Island, Abu Dhabi

Client: ALDAR

Contractor: Taisei Corporation (Consultant – Halcrow)

Scope of Work: Tunnel Drainage System with three Pumping Stations (16 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 40 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.