Scope of Work: Tunnel Drainage System with Two Pumping Stations (5 Pumps) and SCADA interface full Auto operation and Tunnel Ventilation system complete with 20 numbers of Jet fan and all required cabling, control panel and SCADA interface to operate the system in full auto operation.